Line 2 (Chengdu Metro)

Line 2
 2 
Train of Line 2 at Xipu station
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Stations32
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
Daily ridership927,200 (2018 Peak)[1]
History
Opened16 September 2012; 13 years ago (2012-09-16)
Technical
Line length42.27 km (26.27 mi)[2]
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Hongguang depot
← Wangcongci
Lanjiagou →
Xipu Railway Station  6  Chengdu–Dujiangyan intercity railway
Tianhe Road Line 2 (Chengdu Tram)  T2 
Baicao Road
Jinzhou Road  9 
← Outer
Inner →
Jinke North Road
Chengdu Western ring railway
Yingbin Avenue
Chadianzi Bus Terminal Station Bus interchange
Yangxi Flyover
Yipintianxia  7 
← Outer
Inner →
Shuhan Road East
Baiguolin
← Huilong
Huagui Road →
Chengdu University of TCM &
Sichuan Provincial People's Hospital
 4   5 
Tonghuimen
People's Park
Tianfu Square  1 
← Science City/Wugensong
Weijianian →
Chunxi Road  3 
← Shuangliu West station
Chengdu Medical College →
Dongmen Bridge
Niuwangmiao  6 
← Lanjiagou
Wangcongci →
Niushikou
Dongdalu Road  8 
← Lianhua
Shilidian →
Tazishan Park
Chengdu East Railway Station  7 
← Inner
Outer →
Chengdu East Express train
Chengyu Flyover
Huiwangling
Honghe
Chengdu Academy
of Governance
 9 
← Inner
Outer →
Hongliu depot
Damianpu
Lianshanpo
Jiepai
Shufang
Longping Road
Longquanyi
Cross-platform interchanges between different train categories in Xipu station, Chengdu. The double track of Line 2 of Chengdu Metro is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan intercity railway) is on both sides, respectively. It is the first implementation of Cross-platform interchanges between different train categories in China.[3]

Line 2 of the Chengdu Metro (Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn) is the second line on the metro network in Chengdu, Sichuan. Line 2 is a crosstown northwest-southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on September 16, 2012.[4] An 11 km long mostly elevated extension to Longquanyi began testing in April 2014 opened in October 2014.[5]

Opening timeline

SegmentCommencementLengthStation(s)Name
Chadianzi Bus Terminal — Chengdu Institute of Public Administration16 September 201222.4 km (13.92 mi)20Phase 1
Xipu — Chadianzi Bus Terminal8 June 20138.8 km (5.47 mi)6Phase 2 (eastern section)
Chengdu Institute of Public Administration — Longquanyi26 October 201411.1 km (6.90 mi)6Phase 2 (western section)

Stations

Service
routes
Station

Station nameConnectionsDistance
km
Location
EnglishChinese
0232Xipu Railway Station犀浦 6   CG 0.000.00Pidu
0231Tianhe Road天河路 T2 1.851.85
0230Baicao Road百草路1.653.50
0229Jinzhou Road金周路 9 2.205.70Jinniu
0228Jinke North Road金科北路1.156.85
0227Yingbin Avenue迎宾大道1.057.90
0226Chadianzi Bus Terminal Station茶店子客运站0.908.80
0225Yangxi Flyover羊犀立交 27 1.5010.30
0224Yipintianxia一品天下 7 0.8511.15
0223Shuhan Road East蜀汉路东1.1012.25
0222Baiguolin白果林1.2513.50
0221Chengdu University of TCM &
Sichuan Provincial People's Hospital
中医大·省医院 4   5 1.1514.65Qingyang
0220Tonghuimen通惠门0.8515.50
0219People's Park人民公园 10   17 0.8516.35
0218Tianfu Square天府广场 1 0.9517.30
0217Chunxi Road春熙路 3 1.4018.70Jinjiang
0216Dongmen Bridge东门大桥0.9519.65
0215Niuwangmiao牛王庙 6 0.8020.45
0214Niushikou牛市口Chengdu BRT Chengdu BRT1.6022.05
0213Dongdalu Road东大路 8 0.6022.65
0212Tazishan Park塔子山公园1.1523.80
0211Chengdu East Railway Station成都东客站 7  Chengdu East railway station ICW1.6525.45Chenghua
0210Chengyu Flyover成渝立交0.8026.25
0209Huiwangling惠王陵 30 1.6027.85Longquanyi
0208Honghe洪河0.9528.80
0207Chengdu Academy of Governance成都行政学院 9 1.5030.30
0206Damianpu大面铺3.2033.50
0205Lianshanpo连山坡1.2534.75
0204Jiepai界牌1.2536.00
0203Shufang书房1.8537.85
0202Longping Road龙平路1.9039.75
0201Longquanyi龙泉驿1.7041.45

Est. Completion

Est. CompletionPhase #Starting station/Ending stationLength (KM)stations
2012-9Phase 1Chadianzi Bus TerminalChengdu Institute of Public Administration22.4720
2012-12 (opened on June 1, 2013)Phase 2 - West ExtensionXipuChadianzi Bus Terminal8.7386
2014-12Phase 2 - East ExtensionChengdu Institute of Public AdministrationLongquanyi11.16

Rolling Stock

The rolling stocks of Chengdu Metro Line 2 are all manufactured by CRRC Qingdao Sifang, formerly CSR Qingdao Sifang. Each set has 8 type-B cars, 4 power cars and 2 trailers. It has a maximum operating speed of 80 km/h and are all maintained by the Chengdu Metro Hongliu depot.

SFM14.1 (201-232)

Designated by the manufacturer as SFM14 (Sifang Metro 14), it is the original phase 1 rolling stock of line 2. 32 sets of SFM14 are ordered for the opening of line 2 in 2012.

SFM14.2 (233-242)

SFM32 (243-261)

SFM87 (262-272)

References

  • The information in this article is mostly based on that in its Chinese equivalent.
  1. ^ 戴璐岭 (2018-09-22). "400万!成都地铁线网单日客运量再次刷新纪录". 四川新闻 (in Chinese). Retrieved 2018-10-14.
  2. ^ "干货分享丨城市轨道交通2024年度统计和分析报告". 2025-03-31. Retrieved 2025-12-22.
  3. ^ "成灌快铁犀浦站正式开建". 成都市官方网站. 2009-08-26. Archived from the original on 2014-04-24. Retrieved 2013-08-08.
  4. ^ 成都地铁2号线今日正式开通试运营. Archived from the original on December 19, 2012. Retrieved September 16, 2012.
  5. ^ 阳博. "成都地铁2号线东延线 客车成功"带电"跑_四川在线". sichuan.scol.com.cn. Retrieved 2018-10-07.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_2_(Chengdu_Metro)&oldid=1328875594"