Line 6 (Hangzhou Metro)

Line 6
 6 
Train of Line 6 is departing from Olympic Sports Center station
Overview
StatusPartially operational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
Termini
Stations36
Service
TypeRapid transit
SystemHangzhou Metro
Services2
Operator(s)Hangzhou Metro Corporation
Depot(s)Shuangpu Depot
Fengbei Stabling Yard
Songjiatang Depot
Rolling stockPM119
PM146
History
Opened30 December 2020; 4 years ago (2020-12-30)
Technical
Line length58.5 km (36.4 mi) (Phase 1: 27.0 km, Phase 2: 8.3 km, Fuyang: 23.2 km)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed100 km/h (62 mph)
Route map

Future north extension
33
Goujulong
32
East Railway Station (East Square)
 19 
31
Yuanbaotang
30
Tanhua'an Road
29
Sanbao
 9 
28
Asian Games Village
Fengbei Stabling Yard
27
Fengbei
Left arrow Liangzhu – Chaoyang Right arrow
26
Qianjiang Century City
 2 
25
Expo Center
24
Olympic Sports Center
 7 
23
Xingmin
22
Jiangling Road
 1 
21
Jianghan Road
20
Changhe
 5 
19
Jianye Road
18
Chengye Road
17
Weiye Road
16
Zhejiang Chinese Medical University
 4 
Line 4 interconnection
15
Xipu Road
14
Zhijiang Culture Center
13
West Fenghua Road
Line 12 in the future
12
Xiangshan Campus, China Academy of Art
b3
Xiaming Street
b2
Kehai Road
b1
Shuangpu
Shuangpu Depot
11
Zhejiang Conservatory of Music
10
Zhongcun
district
Xihu
Fuyang
9
East Safari Park
8
Yinhu
7
Huxiaoxing
6
Shouxiang
Songjiatang Depot
5
Fuyang Coach Center
4
Gaoqiao
3
Yangbeihu
2
Gongwang Street
1
West Guihua Road
Line 6
Simplified Chinese杭州地铁六号线
Traditional Chinese杭州地鐵六號線
Transcriptions
Standard Mandarin
Hanyu PinyinHǎngzhōu Dìtiě Lìuhào Xiàn
Line 6 drawn to scale.

Line 6 (Chinese: 杭州地铁6号线) is a subway line of the Hangzhou Metro, in Zhejiang, China. The line runs from Shuangpu (in Xihu District) and West Guihua Road (in Fuyang District), merging at Xiangshan Campus, China Academy of Art station, stretching through the south bank of Qiantang River before turning northwest and ending at Goujulong. It connects Fuyang District with Binjiang District, Hangzhou Olympic Expo Center, Qianjiang Century City and Hangzhou East railway station. The line is 58.75 km (36.51 mi) long.

Phase 1 and Fuyang Section was opened on 30 December 2020. Phase 2 opened on 6 November 2021.[1] The line's color is blue. In future planning, the stations from Shuangpu to Xiaming Street will merge to Line 12.

Opening timeline

SegmentCommencementLengthStation(s)Name
Shuangpu — Qianjiang Century City30 December 2020; 4 years ago (2020-12-30)26.95km17Phase 1
Xiangshan Campus, CAA — West Guihua Road23.47km11Fuyang Section (former Fuyang Line)
Zhipu Road29 April 2021; 4 years ago (2021-04-29)Infill station1
Qianjiang Century City — Goujulong6 November 2021; 4 years ago (2021-11-06)[1]8.4 km[2]5Phase 2[1]
Asian Games Village and Fengbei21 February 2023; 2 years ago (2023-02-21)[3]Infill station2

Stations

Service

Routes

Station nameConnectionsDate openedLocationSection
EnglishChinese
Goujulong枸桔弄6 November 2021[1]ShangchengPhase 2
East Railway Station (East Square)火车东站(东广场) 19 
 1   4  (via East Railway Station)
Hangzhou East railway station HGH
Yuanbaotang元宝塘
Tanhua'an Road昙花庵路
Sanbao三堡 9 
Asian Games Village亚运村21 February 2023Xiaoshan
Fengbei丰北 15 Phase 1
Qianjiang Century City钱江世纪城 2 30 December 2020
Expo Center博览中心
Olympic Sports Center奥体中心 7 Xiaoshan/

Binjiang

Xingmin星民Binjiang
Jiangling Road江陵路 1 
Jianghan Road江汉路 18 
Changhe长河 5 
Jianye Road建业路
Chengye Road诚业路
Weiye Road伟业路
Zhejiang Chinese Medical University中医药大学 4 
Xipu Road西浦路
Zhijiang Culture Center[note 1]之江文化中心29 April 2021Xihu
West Fenghua Road枫桦西路30 December 2020
Xiangshan Campus, China Academy of Art美院象山 12 
|Zhejiang Conservatory of Music音乐学院Fuyang Section
|Zhongcun中村
|East Safari Park野生动物园东Fuyang
|Yinhu银湖
|Huxiaoxing虎啸杏
|Shouxiang受降
|Fuyang Coach Center富阳客运中心
|Gaoqiao高桥
|Yangbeihu阳陂湖
|Gongwang Street公望街
|West Guihua Road桂花西路
Xiaming Street霞鸣街30 December 2020XihuPhase 1
Kehai Road科海路
Shuangpu双浦
  1. ^ Was Zhipu Road until 1 February 2024

Rolling stock

StockClassYear builtBuilderNumber builtNumbersFormationDepotsLine assignedNotes
PM119B2017-2019CRRC Nanjing Puzhen252 (42 sets)06 001 - 06 042 (060011-060426)Tc+Mp+M+M+Mp+TcShuangpu Depot
Fengbei Yard
Songjiatang Depot
 6 
PM1462020-202172 (12 sets)06 043 - 06 054 (060431-060546)

See also

References

  1. ^ a b c d "来了!6号线二期明天开通,"证件照"抢先看". 2021-11-05. Archived from the original on 2021-11-05.
  2. ^ "火车东站将迎来四地铁时代!地铁6号线二期开通在即,暂时无法与1、4号线站内换乘". 2021-10-22.
  3. ^ "杭州地铁文三路站、丰北站、亚运村站明日开通!出行信息提前掌握-杭州新闻中心-杭州网". hznews.hangzhou.com.cn. Retrieved 2023-02-20.
Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_6_(Hangzhou_Metro)&oldid=1312983894"