List of Baku Metro stations

Jump to content
From Wikipedia, the free encyclopedia

This is a list of metro stations of Baku Metro in Baku, Azerbaijan. At present Baku Metro has 27 metro stations. The Red Line (Qırmızı xətt) has 13 metro stations, the Green Line (Yaşıl xətt) has 10 metro stations and the Purple Line (Bənövşəyi xətt) has 4 metro stations.[1]

Stations

[edit]
Iceri Seher Metro Station
28 May Metro Station
Sahil Metro Station (Train 81-717M/714M Type with new front-Modernized locally by Baku Metro LLC)
Nasimi Metro Station
Khojasan station
Sahil Metro Station
Line(s)Number of StationsStructureOpening dateLength
(km)
M11312 Underground, 1 Surface196720.1
M21010 Underground197614.5
M343 Underground, 1 Surface20166.1
Total2740.7
Baku Metro
Hazi Aslanov
Ahmedli
Halglar Doslugu
Neftchilar
Gara Garayev
Koroğlu
Ulduz
Bakmil
Nariman Narimanov
Ganjlik
Shah Ismail Khatai
28 May
Jafar Jabbarly
Nizami Ganjavi
Sahil
Elmler Akademiyasi
Icheri Sheher
Inshaatchilar
20 Yanvar
8 Noyabr
Memar Ajami
Avtovağzal
Nasimi
Khojasan
Azadliq prospekti
Darnagul
List of open stations
Station name (English)Station name
(Azerbaijani)
Line(s)StructureOpening dateInterchange
Icheri Sheherİçərişəhər    pylon, deepNovember 6, 1967
SahilSahil    pylon, deepNovember 6, 1967
28 May28 May              pylon, deepNovember 6, 1967 [2]
GanjlikGənclik         columnar, medium deepNovember 6, 1967
Nariman NarimanovNəriman Nərimanov         columnar, medium deepNovember 6, 1967
BakmilBakmil         surface, one-wayMarch 28, 1979
UlduzUlduz         columnar, medium deepMay 5, 1970
KorogluKoroğlu         columnar, medium deepNovember 7, 1972 [3]
Gara GarayevQara Qarayev         columnar, medium deepNovember 7, 1972
NeftchilarNeftçilər         columnar, medium deepNovember 7, 1972
Halglar DosluguXalqlar Dostluğu         columnar, medium deepApril 28, 1989
AhmedliƏhmədli         columnar, medium deepApril 28, 1989
Hazi AslanovHəzi Aslanov         columnar, medium deepDecember 10, 2002
Nizami GanjaviNizami Gəncəvi    pylon, deepDecember 31, 1976
Elmlar AkademiyasıElmlər Akademiyası     pylon, deepDecember 31, 1985
Inshaatchilar'İnşaatçılar    columnar, medium deepDecember 31, 1985
20 Yanvar20 Yanvar    columnar, medium deepDecember 31, 1985
Memar AjamiMemar Əcəmi         columnar, medium deepDecember 31, 1985
NasimiNəsimi    columnar, medium deepOctober 9, 2008
Azadlig ProspektiAzadlıq prospekti    single-vault, medium deepDecember 30, 2009
DarnagulDərnəgül    single-vault, medium deepJune 29, 2011 [4]
Jafar JabbarliCəfər Cabbarlı         pylon, deepDecember 27, 1993 [5]
Shah Ismail HataiŞah İsmail Xətai    pylon, deepFebruary 22, 1968
Memar Ajami-2Memar Əcəmi-2         single-vault, deepApril 19, 2016
KhojasanXocəsən     surface, one-wayDecember 23, 2022
AvtovagzalAvtovağzal     single-vault, medium deepApril 19, 2016
8 Noyabr8 Noyabr     single-vault, deepMay 29, 2021

Under construction stations

[edit]

There are 5 stations under construction.[citation needed]

Station name
(English)
Station name
(Azerbaijani)
Line(s)StructureOpening dateInterchange
Sports - Complex (B-4)Cəlil Məmmədquluzadə       [6]single-vault, deep (Under Construction)2026
Darnagul Depot (Y-4B)Dərnəgül Deposu     surface, one-way (Under Construction)2027
White City (Y-14)Ağ Şəhər     On-Hold [7]Until 2030[8] (Future)
Baku Oil Refinery (Y-15)Azər Neft Yağ     On-Hold [9]Until 2030
Hazi Aslanov-2 (Y-17)Həzi Aslanov-2         On-Hold [10]Until 2030


See also

[edit]

References

[edit]
  1. ^ "Baku Metro". UrbanRail.
  2. ^ "Airport Transfer Bus"
  3. ^ "Airport Transfer Bus"
  4. ^ "Under Construction"
  5. ^ "Airport Transfer Bus"
  6. ^ "New line in the future"
  7. ^ "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
  8. ^ "Transfer by Tram in the Future"
  9. ^ "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
  10. ^ "a 3 km section of the second line from Hazi Aslanov to Yeni Gunesli (3 stations) was supposed to open in 2015 after construction had started in August 2011."Baku Metro". UrbanRail."
[edit]

    This is a list of metro stations of Baku Metro in Baku, Azerbaijan. At present Baku Metro has 27 metro stations. The Red Line (Qırmızı xətt) has 13 metro stations, the Green Line (Yaşıl xətt) has 10 metro stations and the Purple Line (Bənövşəyi xətt) has 4 metro stations.[1]

    Stations

    Iceri Seher Metro Station
    28 May Metro Station
    Sahil Metro Station (Train 81-717M/714M Type with new front-Modernized locally by Baku Metro LLC)
    Nasimi Metro Station
    Khojasan station
    Sahil Metro Station
    Line(s)Number of StationsStructureOpening dateLength
    (km)
    M11312 Underground, 1 Surface196720.1
    M21010 Underground197614.5
    M343 Underground, 1 Surface20166.1
    Total2740.7
    Baku Metro
    Hazi Aslanov
    Ahmedli
    Halglar Doslugu
    Neftchilar
    Gara Garayev
    Koroğlu
    Ulduz
    Bakmil
    Nariman Narimanov
    Ganjlik
    Shah Ismail Khatai
    28 May
    Jafar Jabbarly
    Nizami Ganjavi
    Sahil
    Elmler Akademiyasi
    Icheri Sheher
    Inshaatchilar
    20 Yanvar
    8 Noyabr
    Memar Ajami
    Avtovağzal
    Nasimi
    Khojasan
    Azadliq prospekti
    Darnagul
    List of open stations
    Station name (English)Station name
    (Azerbaijani)
    Line(s)StructureOpening dateInterchange
    Icheri Sheherİçərişəhər    pylon, deepNovember 6, 1967
    SahilSahil    pylon, deepNovember 6, 1967
    28 May28 May              pylon, deepNovember 6, 1967 [2]
    GanjlikGənclik         columnar, medium deepNovember 6, 1967
    Nariman NarimanovNəriman Nərimanov         columnar, medium deepNovember 6, 1967
    BakmilBakmil         surface, one-wayMarch 28, 1979
    UlduzUlduz         columnar, medium deepMay 5, 1970
    KorogluKoroğlu         columnar, medium deepNovember 7, 1972 [3]
    Gara GarayevQara Qarayev         columnar, medium deepNovember 7, 1972
    NeftchilarNeftçilər         columnar, medium deepNovember 7, 1972
    Halglar DosluguXalqlar Dostluğu         columnar, medium deepApril 28, 1989
    AhmedliƏhmədli         columnar, medium deepApril 28, 1989
    Hazi AslanovHəzi Aslanov         columnar, medium deepDecember 10, 2002
    Nizami GanjaviNizami Gəncəvi    pylon, deepDecember 31, 1976
    Elmlar AkademiyasıElmlər Akademiyası     pylon, deepDecember 31, 1985
    Inshaatchilar'İnşaatçılar    columnar, medium deepDecember 31, 1985
    20 Yanvar20 Yanvar    columnar, medium deepDecember 31, 1985
    Memar AjamiMemar Əcəmi         columnar, medium deepDecember 31, 1985
    NasimiNəsimi    columnar, medium deepOctober 9, 2008
    Azadlig ProspektiAzadlıq prospekti    single-vault, medium deepDecember 30, 2009
    DarnagulDərnəgül    single-vault, medium deepJune 29, 2011 [4]
    Jafar JabbarliCəfər Cabbarlı         pylon, deepDecember 27, 1993 [5]
    Shah Ismail HataiŞah İsmail Xətai    pylon, deepFebruary 22, 1968
    Memar Ajami-2Memar Əcəmi-2         single-vault, deepApril 19, 2016
    KhojasanXocəsən     surface, one-wayDecember 23, 2022
    AvtovagzalAvtovağzal     single-vault, medium deepApril 19, 2016
    8 Noyabr8 Noyabr     single-vault, deepMay 29, 2021

    Under construction stations

    There are 5 stations under construction.[citation needed]

    Station name
    (English)
    Station name
    (Azerbaijani)
    Line(s)StructureOpening dateInterchange
    Sports - Complex (B-4)Cəlil Məmmədquluzadə       [6]single-vault, deep (Under Construction)2026
    Darnagul Depot (Y-4B)Dərnəgül Deposu     surface, one-way (Under Construction)2027
    White City (Y-14)Ağ Şəhər     On-Hold [7]Until 2030[8] (Future)
    Baku Oil Refinery (Y-15)Azər Neft Yağ     On-Hold [9]Until 2030
    Hazi Aslanov-2 (Y-17)Həzi Aslanov-2         On-Hold [10]Until 2030


    See also

    References

    1. ^ "Baku Metro". UrbanRail.
    2. ^ "Airport Transfer Bus"
    3. ^ "Airport Transfer Bus"
    4. ^ "Under Construction"
    5. ^ "Airport Transfer Bus"
    6. ^ "New line in the future"
    7. ^ "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
    8. ^ "Transfer by Tram in the Future"
    9. ^ "Construction of the intermediate section on the Green Line between Xatai and Hazi Aslanov with three new stations started in Aug. 2013" "Baku Metro". UrbanRail.
    10. ^ "a 3 km section of the second line from Hazi Aslanov to Yeni Gunesli (3 stations) was supposed to open in 2015 after construction had started in August 2011."Baku Metro". UrbanRail."
    • Baku Metro (in Azerbaijani, English, Russian, and French)
    • Urbanrail – Baku Metro (in English)
    Retrieved from "https://en.wikipedia.org/w/index.php?title=List_of_Baku_Metro_stations&oldid=1326380502"