Turlock station

Jump to content
Coordinates: 37°30′21″N 120°51′35″W / 37.505941°N 120.859755°W / 37.505941; -120.859755
From Wikipedia, the free encyclopedia

Turlock 
General information
LocationGolden State Blvd.
Turlock, California
Coordinates37°30′21″N 120°51′35″W / 37.505941°N 120.859755°W / 37.505941; -120.859755
LineUPRR Fresno Subdivision
Platforms1 island platform[1]
Tracks2
ConnectionsBus transport Turlock Transit
Bus transport Greyhound Lines
Construction
Parkingyes
Other information
Statusplanned
History
Opening2029
Future services
Preceding stationAltamont Corridor Express Altamont Corridor ExpressFollowing station
2029
Ceres
toward San Jose
San Jose – MercedTerminus
CeresValley Rail
2030
Ceres
toward San Jose
San Jose – MercedLivingston
toward Merced
CeresValley Rail
Ceres
toward Union City
Union City – Merced
Opening 2030[2][3][4]
Location
Map

Turlock station is a future Altamont Corridor Express station in the city of the same name. It is expected to open to revenue service in 2029 as part of the second phase of ACE's Merced Extension project to Merced.[5][6][7] The station would be located at the intersection of Golden State Boulevard and Front Street approximately a mile from downtown. The platform is planned to be connected to the Turlock Transit Roger K. Fall Transit Center via an elevated pedestrian bridge.[8] The station would be across a street or two from the city's Greyhound Lines bus stop.

The former Southern Pacific Railroad station in Turlock, about 1.1 miles (1.8 km) away from the planned commuter rail station

References

[edit]
  1. ^ "Ceres-Merced DEIR ACE Ceres–Merced Extension Draft EIR Executive Summary" (PDF). SJRRC. Retrieved May 12, 2021.
  2. ^ "Union City ACE/BART Rail-to-Rail Hub Station: Project Overview and Update". San Joaquin Regional Rail Commission. June 2022.
  3. ^ Krause, Daniel; Mangonon, Anthony (June 1, 2022). Deliverable 3.1.3 (Initial Service and Operations Planning Analysis) (PDF). Wordpress (Report). AECOM. Retrieved December 21, 2023.
  4. ^ "Union City on track to become regional transit hub by 2030". East Bay Echo. December 12, 2023. Retrieved December 22, 2023.
  5. ^ Holland, John (December 4, 2021). "Board advances ACE service to Turlock and Merced County. When will first train run?". Modesto Bee. Retrieved December 9, 2021.
  6. ^ Luczak, Marybeth (December 6, 2021). "ACE Ceres-Merced Extension Project Advances". Railway Age. Retrieved December 9, 2021.
  7. ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.
  8. ^ "Draft EIR Chapter 2 Project Description" (PDF). SJRRC. pp. 2–22, 2–23. Retrieved May 12, 2021.


    Turlock 
    General information
    LocationGolden State Blvd.
    Turlock, California
    Coordinates37°30′21″N 120°51′35″W / 37.505941°N 120.859755°W / 37.505941; -120.859755
    LineUPRR Fresno Subdivision
    Platforms1 island platform[1]
    Tracks2
    ConnectionsBus transport Turlock Transit
    Bus transport Greyhound Lines
    Construction
    Parkingyes
    Other information
    Statusplanned
    History
    Opening2029
    Future services
    Preceding stationAltamont Corridor Express Altamont Corridor ExpressFollowing station
    2029
    Ceres
    toward San Jose
    San Jose – MercedTerminus
    CeresValley Rail
    2030
    Ceres
    toward San Jose
    San Jose – MercedLivingston
    toward Merced
    CeresValley Rail
    Ceres
    toward Union City
    Union City – Merced
    Opening 2030[2][3][4]
    Location
    Map

    Turlock station is a future Altamont Corridor Express station in the city of the same name. It is expected to open to revenue service in 2029 as part of the second phase of ACE's Merced Extension project to Merced.[5][6][7] The station would be located at the intersection of Golden State Boulevard and Front Street approximately a mile from downtown. The platform is planned to be connected to the Turlock Transit Roger K. Fall Transit Center via an elevated pedestrian bridge.[8] The station would be across a street or two from the city's Greyhound Lines bus stop.

    The former Southern Pacific Railroad station in Turlock, about 1.1 miles (1.8 km) away from the planned commuter rail station

    References

    1. ^ "Ceres-Merced DEIR ACE Ceres–Merced Extension Draft EIR Executive Summary" (PDF). SJRRC. Retrieved May 12, 2021.
    2. ^ "Union City ACE/BART Rail-to-Rail Hub Station: Project Overview and Update". San Joaquin Regional Rail Commission. June 2022.
    3. ^ Krause, Daniel; Mangonon, Anthony (June 1, 2022). Deliverable 3.1.3 (Initial Service and Operations Planning Analysis) (PDF). Wordpress (Report). AECOM. Retrieved December 21, 2023.
    4. ^ "Union City on track to become regional transit hub by 2030". East Bay Echo. December 12, 2023. Retrieved December 22, 2023.
    5. ^ Holland, John (December 4, 2021). "Board advances ACE service to Turlock and Merced County. When will first train run?". Modesto Bee. Retrieved December 9, 2021.
    6. ^ Luczak, Marybeth (December 6, 2021). "ACE Ceres-Merced Extension Project Advances". Railway Age. Retrieved December 9, 2021.
    7. ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.
    8. ^ "Draft EIR Chapter 2 Project Description" (PDF). SJRRC. pp. 2–22, 2–23. Retrieved May 12, 2021.


    Retrieved from "https://en.wikipedia.org/w/index.php?title=Turlock_station&oldid=1327941104"