Line 2 (Shaoxing Metro)

Jump to content
From Wikipedia, the free encyclopedia
Line 2
 2 
Line 2 train at Tandu station
Overview
StatusOperational
LocaleShaoxing, Zhejiang, China
Termini
Stations9
Service
TypeRapid transit
SystemShaoxing Metro
Operator(s)Shaoxing Metro Corporation
Rolling stockPM201
History
Opened26 July 2023; 2 years ago (2023-07-26)
Technical
Line length10.55 km (6.56 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)

Line 2 of Shaoxing Metro (Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, Zhejiang Province, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations.[1]

Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan.[2] Construction started on 1 March 2020, and the line was officially opened for operation on 26 July 2023.[3][4] The line uses 4-car trains initially and would have mixed operations of 4 and 6-car trains in the long term.[5]

Opening timeline

[edit]
SegmentCommencementLengthStation(s)
Jinghu Hospital — Tandu26 July 202310.55 km (6.56 mi)9

Stations

[edit]
Station NameConnectionsDistance
km
Location
EnglishChinese
The General People's Hospital[note 1]人民医院总院  Yuecheng
Meishan Square梅山广场1  
Houshu Road后墅路  
Paogu袍谷  
Paozhong Road袍中路  
Yangjinghu洋泾湖  
Xunnan恂南3  
Doujiang豆姜  
Tandu檀渎  

Rolling stock

[edit]
StockClassYear builtBuilderNumber builtNumbersFormationDepotsLine assignedNotes
PM201B2022–2023CRRC Nanjing Puzhen44 (11 sets)02 001 - 02 011 (020011–020114)TMc+Mp+Mp+TMcDoujiang Sidings2
PMAK2202540 (10 sets)02 012 - 02 021 (020121–020214)Under construction.

Notes

[edit]
  1. ^ Was Jinghu Hospital until 28 February 2024

References

[edit]
  1. ^ "绍兴地铁2号线一期工可研、初步设计先后获批 即将开工建设". 中国e车网. 2019-12-24. Archived from the original on 2019-12-29. Retrieved 2024-03-11.
  2. ^ "国务院正式批复绍兴城市轨道交通 官方公布路线图". 浙江日报. 2016-06-02. Archived from the original on 2016-08-12. Retrieved 2024-03-11.
  3. ^ "我市轨道交通2号线一期工程正式开工建设". 2020-03-01. Archived from the original on 2020-03-03. Retrieved 2024-03-11.
  4. ^ "绍兴地铁2号线一期7月26日开通运营!". 绍兴市轨道交通集团有限公司官方微信公众号. 2023-07-25. Archived from the original on 2023-07-25. Retrieved 2024-03-11.
  5. ^ "定了!绍兴地铁2号线一期获批,这些沿线楼盘迎来大利好!". 腾讯网. 2019-12-26. Archived from the original on 2019-12-29. Retrieved 2024-03-11.
    Line 2
     2 
    Line 2 train at Tandu station
    Overview
    StatusOperational
    LocaleShaoxing, Zhejiang, China
    Termini
    • Jinghu Hospital
    • Tandu
    Stations9
    Service
    TypeRapid transit
    SystemShaoxing Metro
    Operator(s)Shaoxing Metro Corporation
    Rolling stockPM201
    History
    Opened26 July 2023; 2 years ago (2023-07-26)
    Technical
    Line length10.55 km (6.56 mi)
    CharacterUnderground
    Track gauge1,435 mm (4 ft 8+12 in)
    Operating speed100 km/h (62 mph)

    Line 2 of Shaoxing Metro (Chinese: 绍兴轨道交通2号线) is a metro line in Shaoxing, Zhejiang Province, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations.[1]

    Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan.[2] Construction started on 1 March 2020, and the line was officially opened for operation on 26 July 2023.[3][4] The line uses 4-car trains initially and would have mixed operations of 4 and 6-car trains in the long term.[5]

    Opening timeline

    SegmentCommencementLengthStation(s)
    Jinghu Hospital — Tandu26 July 202310.55 km (6.56 mi)9

    Stations

    Station NameConnectionsDistance
    km
    Location
    EnglishChinese
    The General People's Hospital[note 1]人民医院总院  Yuecheng
    Meishan Square梅山广场1  
    Houshu Road后墅路  
    Paogu袍谷  
    Paozhong Road袍中路  
    Yangjinghu洋泾湖  
    Xunnan恂南3  
    Doujiang豆姜  
    Tandu檀渎  

    Rolling stock

    StockClassYear builtBuilderNumber builtNumbersFormationDepotsLine assignedNotes
    PM201B2022–2023CRRC Nanjing Puzhen44 (11 sets)02 001 - 02 011 (020011–020114)TMc+Mp+Mp+TMcDoujiang Sidings2
    PMAK2202540 (10 sets)02 012 - 02 021 (020121–020214)Under construction.

    Notes

    1. ^ Was Jinghu Hospital until 28 February 2024

    References

    1. ^ "绍兴地铁2号线一期工可研、初步设计先后获批 即将开工建设". 中国e车网. 2019-12-24. Archived from the original on 2019-12-29. Retrieved 2024-03-11.
    2. ^ "国务院正式批复绍兴城市轨道交通 官方公布路线图". 浙江日报. 2016-06-02. Archived from the original on 2016-08-12. Retrieved 2024-03-11.
    3. ^ "我市轨道交通2号线一期工程正式开工建设". 2020-03-01. Archived from the original on 2020-03-03. Retrieved 2024-03-11.
    4. ^ "绍兴地铁2号线一期7月26日开通运营!". 绍兴市轨道交通集团有限公司官方微信公众号. 2023-07-25. Archived from the original on 2023-07-25. Retrieved 2024-03-11.
    5. ^ "定了!绍兴地铁2号线一期获批,这些沿线楼盘迎来大利好!". 腾讯网. 2019-12-26. Archived from the original on 2019-12-29. Retrieved 2024-03-11.
    Retrieved from "https://en.wikipedia.org/w/index.php?title=Line_2_(Shaoxing_Metro)&oldid=1327962749"